ProteCoolingProteCoolingProteCooling
+966 13 833 1083
8am - 5pm
Kingdom of Saudi Arabia
ProteCoolingProteCoolingProteCooling

KAUST District Cooling

Zamil

Client

Jubail

Project Loction

Description

KAUST District Cooling

Performed the Hydraulic analysis for the entire the chilled water network. The capacity of the network is 40,000TR. We have also performed Hydraulic modeling for existing chilled water network to add the new facilities (SSOI buildings and SSC) to the chilled water network.

At vero eos et accusamus et iusto odio digni goikussimos ducimus qui to bonfo blanditiis praese. Ntium voluum deleniti atque.

ProteCooling